โ† Do it right the first time

Solar & Renewable Energy Installations

End load shedding permanently. COC-certified commercial and residential PV solar installations across Gauteng and Limpopo.

Why This Service Is
Business-Critical

South Africa’s energy crisis shows no sign of ending. Every stage of load shedding costs your business in lost productivity, damaged equipment, and emergency generator fuel. For schools, it disrupts learning. For mining operations, it halts production. For commercial properties, it drives tenants away. Grid dependency is a business risk โ€” and it has a permanent solution.

Solar

What We Deliver

We design, supply, and install commercial and residential PV solar systems engineered for your specific load requirements. Every installation is fully certified with a Certificate of Compliance (COC) โ€” meeting SANS 10142-1, NRS 097, and NRS 057 standards. We handle everything from site assessment and system design through to installation, commissioning, and handover documentation.

Compliance Standard: SANS 10142-1 ยท NRS 097 ยท NRS 057 ยท Electricity Regulation Act

โœ“Grid-tied, off-grid, and hybrid PV system design and installation
โœ“Certificate of Compliance (COC) issued on every installation
โœ“Site load assessment and system sizing
โœ“Battery storage and inverter integration
โœ“SANS 10142-1 and NRS 097 compliant installations
โœ“Load shedding mitigation systems for commercial facilities
โœ“Full commissioning documentation and handover pack
โœ“Post-installation monitoring and maintenance support

Frequently Asked Questions

Common Questions About
Solar & Renewable Energy Installations

Q: Do you issue a COC on all solar installations?

A: Yes โ€” without exception. A Certificate of Compliance is a legal requirement under the Electrical Installation Regulations and is issued on every solar PV system we complete. We will never hand over a system without it.

Q: What is the difference between grid-tied, off-grid, and hybrid systems?

A: A grid-tied system feeds excess energy back to the grid. An off-grid system operates completely independently from Eskom. A hybrid system combines both โ€” using solar first, battery storage as backup, and the grid as a last resort. We recommend the right system for your load profile and budget.

Q: How long does a commercial solar installation take?

A: Depending on system size, a commercial installation typically takes between 3 and 10 working days from site commencement to commissioning. We provide a project schedule before work begins.

Q: Can solar power my entire facility?

A: In most cases, yes โ€” with the right system size. Our site assessment determines your current load, peak demand, and future growth requirements. We then design a system that meets your energy independence goals within your budget.

Q: What maintenance does a solar system require?

A: PV panels require minimal maintenance โ€” typically a quarterly clean and an annual electrical inspection. We offer maintenance contracts that include regular inspections, cleaning, and performance monitoring to protect your investment.